September 23, 2014

BMSC NR Logo

Bisha Mining Announces Further Exploration Drilling Results for Harena

 

HIGHLIGHTS
 

Intersections of massive sulphide including:

  • Hole HX-011: 0.75% Cu, 5.18% Zn, 0.40 g/t Au, 43.4 g/t Ag over 21.5 meters

  • Hole HX-012: 0.96% Cu, 6.57% Zn, 0.30 g/t Au, 30.1 g/t Ag over 13.5 meters
  • Hole HX-017: 0.85% Cu, 3.96% Zn, 0.40 g/t Au, 43.6 g/t Ag over 41.6 meters

High grade gold-rich footwall stringer intersections including:

  • Hole HX-008: 0.71% Cu, 0.22% Zn, 6.15 g/t Au, 241.6 g/t Ag over 17.2 meters
  • Hole HX-012: 0.15% Cu, 0.25% Zn, 6.22 g/t Au, 83.1 g/t Ag over 10.0 meters
  • Hole HX-019: 0.56% Cu, 0.23% Zn, 8.03 g/t Au, 119.7 g/t Ag over 5.5 meters
  • Hole HX-020: 0.25% Cu, 0.11% Zn, 8.50 g/t Au, 146.2 g/t Ag over 14.0 meters
  • Deposit extension confirmed with increasing width and depth of mineralization extended to 400 meters
  • Mineralization remains open at depth and along strike
  • Additional drilling and geophysical surveys ongoing
     

Bisha Mining Share Company (BMSC) is pleased to announce exploration drill results from the Harena Mining License located 10 kilometers south of the Bisha Mine and processing plant.  The drilling was completed as part of the 2014 Bisha Regional Exploration program.

BMSC Chairman, Cliff Davis, commented, “Our exploration program at Harena continues to be successful in demonstrating that our known resources remain open for further expansion.  The Bisha area is under-explored and we will further assess Harena and the greater potential of the Bisha VMS belt.”

2014 Regional Exploration Program Update

To-date, BMSC has completed approximately 18,500 meters of a 25,000 meter planned diamond drilling program.  Diamond drilling is in progress at Harena with two diamond drills operating and will resume on the Mogoraib River Exploration License in October following the short rainy season.  Geophysical surveys are also in progress and consist of ground and borehole Transient Electromagnetic (BHTEM) surveys.  These surveys have been instrumental in guiding the drilling at Harena.

 Harena Drill Results

The 2014 Harena exploration program is designed to expand the deposit beyond the known resource following-up on the encouraging results encountered in hole HX-005 (1.77% Cu, 3.99% Zn, 1.22 g/t Au, 77.9 g/t Ag over 18.5 meters - see Press Release August 18, 2014).  Drilling to the south and below HX-005 has been successful in expanding the deposit by 300 meters to the south and to a depth of 400 meters below surface.  A plan map of the drilling and representative sections are attached at the end of this release.

Thick intervals of massive, semi-massive and stringer sulphides have been encountered up to 300 meters below hole HX-005 over a 150 meter strike length including a 58.7 meter interval in hole HX-012.  These thicknesses are significantly greater than that of the historic resource and the deposit remains open to depth and along strike.  Assay results for holes drilled down to approximately 200 meters below surface have been received (HX-008 to HX-020 excluding HX-021) while assay results from a deeper tier of holes (HX-022 to HX-026) are pending.  Drilling is being guided by BHTEM and the massive sulphides give strong electromagnetic (EM) responses.  Numerous in-hole, edge and off-hole responses have been detected and the drilling of these targets has been successful. 

Intense sericite and chlorite altered felsic volcanic rocks continue to be intersected in the footwall of the deposit.  Stringer sulphide zones in this alteration immediately below and along strike of massive sulphides are demonstrating high precious metal endowment.  Hole HX-008 immediately along strike of massive sulphides encountered in hole HX-006 intersected 6.15 g/t Au and 241.6 g/t Ag over 17.2 meters.  Similar zones have been intersected in holes HX-006, HX-012, HX-019 and HX-020.

Massive and stringer sulphides have been intersected at more than one horizon in a number of the drill holes such as hole HX-022.  Sulphides zones have been encountered at more than one stratigraphic level in the felsic volcanic package - this suggests that stacked mineralized horizons are present.  The combination of intense footwall and locally hangingwall alteration with stacked mineralized horizons and strong precious metal endowment is a good indication of a large long lived hydrothermal system.  Numerous untested geophysical targets exist outside and along strike of Harena, and these targets will be the focus of future exploration.

Quality Assurance

A Quality Assurance/Quality Control program was part of the sampling program for the Harena work. This program includes chain of custody protocols as well as systematic use of standards, duplicates and blank samples into the flow of samples produced by the sampling. Samples were prepared at African Horn Testing Services (Eritrea) and analyzed at Genalysis Laboratories (a NATA registered laboratory) in Perth, Western Australia.  Drilling intercept lengths only are reported in the tables and text below.

Mr. Robert Foy PGeo., BMSC’s Exploration Manager, has been overseeing the drilling at Harena and is a Qualified Person as defined by NI 43-101.  Mr. Foy has reviewed the technical content of this press release and approved its dissemination.

Forward Looking Statements:  The above contains forward-looking statements regarding drill results and future exploration plans.  Forward-looking statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,” “intends,” “estimated,” “potential,” “possible” and similar expressions, or statements that events, conditions or results “will,” “may,” “could” or “should” occur or be achieved.  Forward-looking statements are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors.  The Company’s forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made and the Company assumes no obligation to update such forward-looking statements in the future.

Bisha Mining Share Company

“Cliff T. Davis”

Cliff T. Davis
Chairman 


Figure 1. Harena Mine – Drillhole Location Map
Harena Drillhole Location Map Sep 2014

Figure 2. Harena - Section A-A’ L5950
Harena Section A-A' L5950

Figure 3. Harena - Section B-B’ L6000

Figure 3. Harena - Section B-B’ L6000
Figure 4. Harena – Section C-C’ L6050

Figure 4. Harena – Section C-C’ L6050
Figure 5. Harena – Section D-D’ L6100

Figure 5. Harena – Section D-D’ L6100



Harena Intersections (not previously reported)

HOLE
ID

From (m)

To (m)

Length
(m)

Cu (%)

Zn (%)

Au (g/t)

Ag (g/t)

HX-007

174.60

182.00

7.40

0.29

1.77

0.47

20.8

HX-008

187.00

204.15

17.15

0.71

0.22

6.15

241.6

includes

189.90

202.65

12.75

0.84

0.19

7.85

268.8

HX-009

178.00

184.50

6.50

0.36

3.40

0.36

38.8

HX-010

172.00

175.50

3.50

0.56

6.92

0.54

37.2

 

190.00

194.00

4.00

0.63

5.51

0.72

34.1

HX-011

207.80

229.30

21.50

0.75

5.18

0.40

43.4

 

272.70

281.20

8.50

0.51

2.84

1.03

42.2

HX-012

230.30

289.00

58.70

0.66

2.43

0.20

24.1

includes

230.30

247.10

16.80

0.86

2.86

0.21

40.7

and

247.10

275.50

28.40

0.39

0.20

0.14

11.4

and

275.50

289.00

13.50

0.96

6.57

0.30

30.1

HX-012

291.00

301.00

10.00

0.15

0.25

6.22

83.1

 

316.00

320.00

4.00

0.01

0.01

8.78

93.8

HX-013

90.90

103.80

12.90

0.09

2.23

0.13

6.9

includes

101.20

103.00

1.80

0.35

14.59

0.19

26.6

HX-014

98.00

103.00

5.00

0.26

2.31

0.28

16.3

includes

101.10

103.00

1.90

0.66

6.05

0.33

38.9

HX-015

108.50

109.00

0.50

0.12

1.11

0.01

2.5

HX-016

190.80

197.80

7.00

0.32

2.32

0.37

30.4

HX-017

235.40

277.00

41.60

0.85

3.96

0.40

43.6

Includes

235.40

268.80

33.40

0.76

4.78

0.23

43.6

and

268.80

277.00

8.20

1.19

0.58

1.09

43.3

HX-018

181.00

182.15

1.15

0.52

0.04

1.16

65.0

HX-019

264.50

270.00

5.50

0.56

0.23

8.04

119.7

HX-020

258.00

272.00

14.00

0.25

0.11

8.50

146.2

includes

259.00

265.00

6.00

0.22

0.08

18.31

292.3

 

 

Harena Collar Locations

HOLE
ID

UTM
Easting

UTM
Northing

Elevation

Depth (m)

Dip

Azimuth

HX-007

334505

1707620

603

237

-60

125

HX-008

334530

1707665

602

251

-60

125

HX-009

334455

1707535

603

226

-60

125

HX-010

334481

1707580

603

251

-60

125

HX-011

334550

1707775

601

365

-60

125

HX-012

334499

1707751

602

354

-60

125

HX-013

334581

1707629

602

254

-60

125

HX-014

334529

1707545

603

271

-60

125

HX-015

334504

1707501

603

220

-60

125

HX-016

334424

1707501

604

266

-60

125

HX-017

334464

1707711

602

353

-60

125

HX-018

334855

1707986

599

252

-60

125

HX-019

334424

1707624

603

311

-60

125

HX-020

334444

1707665

602

329

-60

125